Reply To: BER and FER calculation

#10335

Hi,

since the BER value is quite low at 38dB SNR, I recommend to try a simulation of this point (only one SNR point to save time) with a high number of frames, e.g., 2000 or even 5000. The values for the two users should be in the same order and the confidence intervals should get quite small.

best
Stefan