I would like to thank you for the replies.
In the simulator the power values are assigned and then the SINR values are calculated before the scheduling process.
I think after the SINR values are calculated it is still possible to define new power levels to the eNB/femto cells.
Is that right?
Besides,
is it possible to change the tx power levels during the scheduling process is performed, e.g. after a determined time?
Best Regards